Network‐based project planning and scheduling
Author:
- Homayoun KhamooshiHKHomayoun Khamooshi
- 1 December 1996
- journal article
- Published by Emerald Publishing in Industrial Management & Data Systems
- Vol. 96 (8) , 13-22
Abstract
Discusses the twofold purpose of this study, first to introduce a number of measures devised to be used in comparing and evaluating two schedules for the same project, second to present and evaluate a heuristic procedure developed in this research for solving the resource constrained project scheduling problem. Posits that the new procedure is based on the notion that a project can be partitioned into a number of sections and there is no obligation to use a single policy all the way through all the sections of project. Shows that this research is also an attempt to bridge the gap between the theory and practice by eliminating the question of which priority rule to use for which project. Develops a new model showing that selecting from a number of priority rules is not required and, using the measures of performance introduced, decides on a suitable schedule from the schedules produced under varied assumptions is shown to be much easier. Concludes with suggestions for further research.Keywords
This publication has 15 references indexed in Scilit:
- A Linear Model for Estimating Project Resource Levels and Target Completion TimesJournal of the Operational Research Society, 1988
- Objective evaluation of nonstorable resource-scheduling profilesInternational Journal of Project Management, 1985
- Critical path analysis and resource constrained project scheduling — Theory and practiceEuropean Journal of Operational Research, 1985
- RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS.Proceedings of the Institution of Civil Engineers, 1985
- Multi-Project Scheduling: Analysis of Project PerformanceIIE Transactions, 1985
- Analysis of a multi-criteria project crashing modelA I I E Transactions, 1978
- A Multi-Resource Project Scheduling AlgorithmA I I E Transactions, 1977
- Project Network Summary Measures Constrained- Resource SchedulingA I I E Transactions, 1975
- Project Scheduling under Resource Constraints—Historical Review and Categorization of ProceduresA I I E Transactions, 1973
- Decision CPM: Network Reduction and SolutionJournal of the Operational Research Society, 1970