Optimal Assignment of Multiskilled Labor in Building Construction Projects
Authors:
- 1 March 2010
- journal article
- research article
- Published by Taylor & Francis in International Journal of Construction Education and Research
- Vol. 6 (1) , 70-80
Abstract
The utilization of multiskilled construction workers has increased in recent years in order to improve the efficiency of resource utilization in construction projects. The successful application of this strategy requires thoughtful assignments of available multiskilled workers to appropriate tasks in construction projects. An optimization model was developed to support field management personnel in this challenging task in order to minimize the total labor cost of the project. The model was designed to consider all practical constraints and limitations involved in this assignment problem, including workers' skill, productivity, and availability constraints. A spreadsheet solver that comes bundled with Microsoft Excel™ was used for the implementation of the model due to its wide availability and ease of use. An application example was analyzed to illustrate the performance of the present model relative to that of an existing model obtained from the literature. The two models were compared with respect to the quality of solutions obtained, and model computational complexity.Keywords
This publication has 21 references indexed in Scilit:
- Assigning cross-trained workers to departments: A two-stage optimization model to maximize utility and skill improvementEuropean Journal of Operational Research, 2007
- Examining the link between skill shortages, training composition and productivity levels in the construction industry: evidence from Northern Ireland1The International Journal of Human Resource Management, 2006
- Conference CalendarIndoor and Built Environment, 2002
- Implementing a multiskilled workforceConstruction Management and Economics, 2001
- Genetic algorithm model in optimizing the use of labourConstruction Management and Economics, 2001
- A genetic algorithm for scheduling staff of mixed skills under multi-criteriaEuropean Journal of Operational Research, 2000
- Staffing a Multiskilled Workforce with Varying Levels of Productivity: An Analysis of Cross‐training Policies*Decision Sciences, 1998
- An algorithm for single shift scheduling of hierarchical workforceEuropean Journal of Operational Research, 1997
- Economic Growth and Multiskilled Workers in ManufacturingJournal of Labor Economics, 1996
- Tour Scheduling and Task Assignment of a Heterogeneous Work Force: A Heuristic ApproachDecision Sciences, 1991