A joint spare part and maintenance inspection optimisation model using the Delay-Time concept
Author:
- Wenbin WangWWWenbin Wang
- 1 November 2011
- journal article
- Published by Elsevier in Reliability Engineering & System Safety
- Vol. 96 (11) , 1535-1541
Abstract
No abstract availableKeywords
This publication has 29 references indexed in Scilit:
- Problem identification in maintenance modelling: a case studyInternational Journal of Production Research, 2008
- Joint optimization of block-replacement and periodic-review spare-provisioning policyIEEE Transactions on Reliability, 2003
- A model to predict the residual life of rolling element bearings given monitored condition information to dateIMA Journal of Management Mathematics, 2002
- A maintenance study of fishing vessel equipment using delay‐time analysisJournal of Quality in Maintenance Engineering, 2001
- Developments in delay time analysis for modelling plant maintenanceJournal of the Operational Research Society, 1999
- Joint optimization of maintenance and inventory policies for a simple systemIIE Transactions, 1996
- On the implementation of a control-based forecasting system for aircraft spare parts procurementIIE Transactions, 1995
- Modelling maintenance practice of production plant using the delay-time conceptIMA Journal of Management Mathematics, 1995
- Economically Optimum Maintenance, Repair and Buffering Operations in Manufacturing SystemsThe Engineering Economist, 1986
- Reducing Production Downtime Using Delay-Time AnalysisJournal of the Operational Research Society, 1984