Innovative Fishbone SAGD Well Pair: An Integrated Approach to Efficiently Unlock the Resource Potential in Canadian Oil Sands Play
Authors:
- 17 March 2015
- conference paper
- Published by Society of Petroleum Engineers (SPE)
Abstract
The Surmont Project operated by ConocoPhillips with 50% partnership of Total E&P Canada is located in the Athabasca region of Northern Alberta. An in-situ thermal development method - Steam Assisted Gravity Drainage (SAGD) technology is used to extract the bitumen from the oil sand. Steam is injected into a horizontal injector well to heat up the bitumen so that it will flow with the support of gravity drainage and get produced from a horizontal well immediately below the injector (Butler 1991; Donnely 1997; Farouq 1997; Pirson et al. 1958). Surmont Phase 2 development consists of 11 pads each designed to accommodate 12 producer and injector wells. The full field design of 11 pads require a distance between lateral trajectories of one well pair and the build sections of wells on the other pad in order avoid the wellbore collision. Representing significant OOIP potential to the project, these buffer zones are larger than the average well spacing, but anticollision concerns with the drilling trajectories of the offsetting pads, do not allow for a regular SAGD well pair to be drilled into the zone. Through the multidisciplinary approach between joint venture partners, an innovative “Fishbone Infill Well Pair” concept was developed for the buffer zone between Pad #1 and Pad #5. In the normal SAGD well pair design, the injector well lateral section is planned 5 meters vertically directly above the producer lateral section. In this case, due to the close proximity of the Pad #1 build sections, the fishbone injector lateral section was planned to be offset laterally a distance of 90 meters and a vertical distance of 21 meters to the fishbone producer well. The producer well, drilled under the build sections of Pad #5, has 6 fishbones which will establish the thermal connection with the injectors. The injector fishbone well, drilled over the built sections of Pad #5, was designed to have 2 fishbones towards producer well, and the toe of the main bore was directionally drilled towards the producer well. Significant anti-collision risks were minimized by utilizing active ranging technologies. All fishbones were sidetracked and drilled with a great success in the poorly consolidated McMurray oil sand formation. Special techniques were in place to avoid collapse risk in sidetrack junction points. Pre-selected fishbones both in producer and injector wells by subsurface team were lined with slotted liners. This paper focuses on the planning, design, drilling execution and lessons learned along the process of realization of this fishbone well pair, which is the first design of its kind in the Canadian oil sands.Keywords
This publication has 4 references indexed in Scilit:
- Test of SAGD Flow Distribution Control Liner System, Surmont Field, Alberta, Canada2012
- Multilateral-Horizontal Wells Increase Rate and Lower Cost Per Barrel in the Zuata Field, Faja, Venezuela2001
- Emerging Technologies For SAGD Drilling And ProductionJournal of Canadian Petroleum Technology, 1998
- A Novel Method of Recovering Heavy Viscous Crude Oils and Tar By Combined In Situ Thermal Treatment and Gravity Drainage1958