Optimized Adaptive Scheduling of a Manufacturing Process System with Multi-skill Workforce and Multiple Machine Types: An Ontology-based, Multi-agent Reinforcement Learning Approach
Authors:
- Shuhui QuSQShuhui Qu
- Jie WangJWJie Wang
- Shivani GovilSGShivani Govil
- James O. LeckieJLJames O. Leckie
Open Access
- 1 January 2016
- journal article
- Published by Elsevier in Procedia CIRP
- Vol. 57, 55-60
Abstract
No abstract availableThis publication has 13 references indexed in Scilit:
- Combining integer programming and the randomization method to schedule employeesEuropean Journal of Operational Research, 2010
- A survey of scheduling with deterministic machine availability constraintsComputers & Industrial Engineering, 2010
- Multi-objective scheduling of dynamic job shop using variable neighborhood searchExpert Systems with Applications, 2010
- A rule-based genetic algorithm for the scheduling of single-stage multi-product batch plants with parallel unitsComputers & Chemical Engineering, 2008
- Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel linesComputers & Chemical Engineering, 2008
- A survey of dynamic scheduling in manufacturing systemsJournal of Scheduling, 2008
- Literature review of JIT-KANBAN systemThe International Journal of Advanced Manufacturing Technology, 2006
- A multi-agent reinforcement learning approach to obtaining dynamic control policies for stochastic lot scheduling problemSimulation Modelling Practice and Theory, 2005
- Dynamic job-shop scheduling using reinforcement learning agentsRobotics and Autonomous Systems, 2000
- Depth-limited search for real-time problem solvingReal-Time Systems, 1990