Re-Entrant Green Scheduling Problem of Bearing Production Shops Considering Job Reworking
Open Access
Abstract
To solve various reworking and repair problems caused by unqualified bearing product quality inspections, this paper introduces a green re-entrant scheduling optimization method for bearing production shops considering job reworking. By taking into account quality inspection constraints, this paper establishes an integrated scheduling mathematical model based on the entire processing–transportation–assembly process of bearing production shops with the goals for minimizing the makespan, total carbon emissions, and waste emissions. To solve these problems, the concepts of the set of the longest common machine routes (SLCMR) and the set of the shortest recombination machine combinations (SSRMC) were used to propose the re-entrant scheduling optimization method, based on system reconfiguration, to enhance the system stability and production scheduling efficiency. Then, a multi-objective hybrid optimization algorithm, based on a neighborhood local search (MOOA-LS), is proposed to improve the search scope and optimization ability by constructing a multi-level neighborhood search structure. Finally, this paper takes a bearing production shop as an example to carry out the case study and designs a series of experimental analyses and comparative tests. The final results show that in the bearing production process, the proposed model and algorithm can effectively realize green and energy-saving re-entrant manufacturing scheduling.Keywords
Funding Information
- National Natural Science Foundation of China (52175153, ZS2021001, GZC20232394, 242102220117)
- Foundation of the Henan Center for Outstanding Overseas Scientists, China (52175153, ZS2021001, GZC20232394, 242102220117)
- Postdoctoral Fellowship Program of CPSF (52175153, ZS2021001, GZC20232394, 242102220117)
- Key Research and Development and Promotion Project of Henan Province (52175153, ZS2021001, GZC20232394, 242102220117)
This publication has 26 references indexed in Scilit:
- Multi-population cooperative multi-objective evolutionary algorithm for sequence-dependent group flow shop with consistent sublotsExpert Systems with Applications, 2023
- An enhanced cross-entropy algorithm for the green scheduling problem of steelmaking and continuous casting with uncertain processing timeComputers & Industrial Engineering, 2022
- Job shop rescheduling with rework and reconditioning in Industry 4.0: an event-driven approachThe International Journal of Advanced Manufacturing Technology, 2022
- Energy efficient cutting parameter optimizationFrontiers of Mechanical Engineering, 2021
- Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumptionJournal of Cleaner Production, 2019
- A framework for stochastic scheduling of two-machine robotic rework cells with in-process inspection systemComputers & Industrial Engineering, 2017
- A two-level method of production planning and scheduling for bi-objective reentrant hybrid flow shopsComputers & Industrial Engineering, 2017
- Optimisation of distributed manufacturing flexible job shop scheduling by using hybrid genetic algorithmsJournal of Intelligent Manufacturing, 2015
- Embedding ant system in genetic algorithm for re-entrant hybrid flow shop scheduling problems with time window constraintsJournal of Intelligent Manufacturing, 2015
- Robust meta-heuristics implementation for unrelated parallel machines scheduling problem with rework processes and machine eligibility restrictionsComputers & Industrial Engineering, 2014