Proactive Production Scheduling Approach for Off-Site Construction with Due Date Uncertainty
Open Access
- 27 November 2024
- journal article
- research article
- Published by MDPI AG in Applied Sciences
- Vol. 14 (23) , 11017
Abstract
This study proposes a robust precast concrete (PC) production scheduling model for PC construction projects with schedule uncertainty by adopting a proactive scheduling approach. The proposed model consists of a PC production simulation module that simulates and evaluates the total tardiness of the schedule at a certain confidence level with contractor schedule uncertainty and a GA-based production schedule optimization module that finds an optimal schedule through iterative schedule generation and evaluation using a PC production simulation module. The experimental study shows that the proposed model can find the best schedule with 303.8 h of tardiness at a 100% confidence level, followed by NEHedd 324.7 h, basic GA 328.5 h, and EDD 335.8 h. The results of this study will help PC production schedulers to perform robustly despite contractors’ schedule changes and will thus contribute to the successful completion of PC construction projects.Keywords
Funding Information
- Seoul National University of Science and Technology
This publication has 22 references indexed in Scilit:
- Green optimization for precast production rescheduling based on disruption managementJournal of Cleaner Production, 2023
- Reinforcement learning approach to scheduling of precast concrete productionJournal of Cleaner Production, 2022
- Dynamic production scheduling model under due date uncertainty in precast concrete constructionJournal of Cleaner Production, 2020
- Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete componentsAutomation in Construction, 2018
- Framework for modeling operational uncertainty to optimize offsite production scheduling of precast componentsAutomation in Construction, 2018
- Inventory management for new products with triangularly distributed demand and lead-timeComputers & Operations Research, 2016
- GA-based decision support systems for precast production planningAutomation in Construction, 2010
- Proactive approach to address the uncertainty in short-term schedulingComputers & Chemical Engineering, 2008
- Genetic algorithms for flowshop scheduling problemsComputers & Industrial Engineering, 1996
- A genetic algorithm for flowshop sequencingComputers & Operations Research, 1995