Risk assessment for digital transformation projects in construction Enterprises: An enhanced FMEA model
Authors:
- Tangzhenhao LiTLTangzhenhao Li
- Jianxin YouJYJianxin You
- Emel AktasEAEmel Aktas
- Yongxin DongYDYongxin Dong
- Miying YangMYMiying Yang
Top Cited Papers
- 22 February 2025
- journal article
- Published by Elsevier in Expert Systems with Applications
- Vol. 274
Abstract
No abstract availableThis publication has 75 references indexed in Scilit:
- System of systems engineering governance framework for digital transformation: A case study of an Australian large government agencySystems Engineering, 2023
- The strategic role of middle managers in the formulation and implementation of digital transformation projectsStrategic Change, 2022
- Financial credit risk assessment of online supply chain in construction industry with a hybrid model chainInternational Journal of Intelligent Systems, 2022
- Technology as Driver, Enabler and Barrier of Digital Transformation: A Review2022
- Digital Innovation Culture: A Systematic Literature Review2021
- Circular Economy and Regeneration of Building Stock: Policy Improvements, Stakeholder Networking and Life Cycle Tools2019
- Using Fuzzy Cost‐Based FMEA, GRA and Profitability Theory for Minimizing Failures at a Healthcare Diagnosis ServiceQuality and Reliability Engineering International, 2013
- A rough TOPSIS Approach for Failure Mode and Effects Analysis in Uncertain EnvironmentsQuality and Reliability Engineering International, 2013
- Spearman Rank Correlation2005
- Fuzzy TOPSIS approach for failure mode, effects and criticality analysisQuality and Reliability Engineering International, 2003