Hydro-Quebec experience with PSS tuning
Authors:
- D. LefebvreDLD. Lefebvre
- M. RacineMRM. Racine
- L. SoulieresLSL. Soulieres
- I. KamwaIKI. Kamwa
- 20 January 2003
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 1, 88-95
Abstract
Hydro-Quebec has added several facilities on its transmission system, including a sixth 735 kV 950 km AC line from the James Bay region, a HVDC link of 1050 km at 450 kV with 3 rectifier-inverter substations between Radisson-Nicolet-Sandy-Ponds, 11200 MVArs of series-compensation and 4680 MW of new generation. These additions modified the overall system behavior significantly. Therefore, a task force was initiated to assess the adequacy and revise on a large scale basis the AVR and PSS settings. This paper first presents the tuning and coordination approach used by the task force. Then the benefits achieved are illustrated with the new settings installed on all 26 stabilizers present in the system. From this number, 21 will be modified during scheduled maintenance over the next few years. TransEnergie expects a significant damping improvement of the major oscillatory modes, with a corresponding /spl sime/400 MW increase of its transmission capability on several 735 kV corridors.Keywords
This publication has 4 references indexed in Scilit:
- State-space system identification-toward MIMO models for modal analysis and optimization of bulk power systemsIEEE Transactions on Power Systems, 2000
- Hydro-Quebec's defence plan against extreme contingenciesIEEE Transactions on Power Systems, 1999
- Low-order black-box models for control system design in large power systemsIEEE Transactions on Power Systems, 1996
- A minimal realization approach to reduced-order modelling and modal analysis for power system response signalsIEEE Transactions on Power Systems, 1993