Operating capability as a PQ/PV node of a direct-drive wind turbine based on a permanent magnet synchronous generator
- 1 June 2010
- journal article
- research article
- Published by Elsevier in Renewable Energy
- Vol. 35 (6) , 1308-1318
Abstract
No abstract availableFunding Information
- Ministerio de Educación, Cultura y Deporte
This publication has 18 references indexed in Scilit:
- Aggregate modelling of wind farms containing full-converter wind turbine generators with permanent magnet synchronous machines: transient stability studiesIET Renewable Power Generation, 2009
- Overview of different wind generator systems and their comparisonsIET Renewable Power Generation, 2008
- A review of power converter topologies for wind generatorsRenewable Energy, 2007
- Modelling and control of synchronous generators for wide‐range variable‐speed wind turbinesWind Energy, 2007
- Wind turbine concept market penetration over 10 years (1995–2004)Wind Energy, 2006
- Modelling and ride‐through capability of variable speed wind turbines with permanent magnet generatorsWind Energy, 2005
- International comparison of requirements for connection of wind turbines to power systemsWind Energy, 2005
- Representing wind turbine electrical generating systems in fundamental frequency simulationsIEEE Transactions on Energy Conversion, 2003
- Grid interface options for variable-speed,permanent-magnet generatorsIEE Proceedings - Electric Power Applications, 1998
- Current phase control methods for permanent magnet synchronous motorsIEEE Transactions on Power Electronics, 1990