Application of PROMETHEE-GAIA method to priority sequencing rules in a dynamic job shop for single machine
Authors:
- Prasad BariPBPrasad Bari
- Prasad KarandePKPrasad Karande
- 1 January 2021
- journal article
- research article
- Published by Elsevier in Materials Today: Proceedings
- Vol. 46, 7258-7264
Abstract
No abstract availableKeywords
This publication has 13 references indexed in Scilit:
- Solution algorithms to minimise the total family tardiness for job shop scheduling with job familiesEuropean J. of Industrial Engineering, 2018
- Evaluation and Selection of Best Priority Sequencing Rule in Job Shop Scheduling using Hybrid MCDM TechniqueIOP Conference Series: Materials Science and Engineering, 2017
- Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup timesEuropean J. of Industrial Engineering, 2017
- Ant colony optimization for job shop scheduling using multi-attribute dispatching rulesThe International Journal of Advanced Manufacturing Technology, 2013
- Application of PROMETHEE-GAIA method for non-traditional machining processes selectionManagement Science Letters, 2012
- Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production systemInternational Journal of Production Economics, 2011
- PROMETHEE: A comprehensive literature review on methodologies and applicationsEuropean Journal of Operational Research, 2010
- Improved heuristics for the n-job single-machine weighted tardiness problemComputers & Operations Research, 1999
- A dynamic forecasting model for job shop flowtime prediction and tardiness controlInternational Journal of Production Research, 1995
- Real-time scheduling of an automated manufacturing centerEuropean Journal of Operational Research, 1989