An ANN parametric approach for the estimation of total production operation time
Authors:
- Mostafa R.A. AtiaMAMostafa R.A. Atia
- Mahmoud MokhtarMahmoud Mokhtar
- Jean KhalilJKJean Khalil
Open Access
- 1 March 2022
- journal article
- research article
- Published by Elsevier in Ain Shams Engineering Journal
- Vol. 13 (2) , 101579
Abstract
No abstract availableKeywords
This publication has 33 references indexed in Scilit:
- A feature-based method for NC machining time estimationRobotics and Computer-Integrated Manufacturing, 2013
- Comparisons between two types of neural networks for manufacturing cost estimation of piping elementsExpert Systems with Applications, 2012
- Applying least squares support vector machines to the airframe wing-box structural design cost estimationExpert Systems with Applications, 2010
- PSO-based back-propagation artificial neural network for product and mold cost estimation of plastic injection moldingComputers & Industrial Engineering, 2010
- Recent and future trends in cost estimationInternational Journal of Computer Integrated Manufacturing, 2002
- Expert Judgement in Cost Estimating: Modelling the Reasoning ProcessConcurrent Engineering, 2001
- Application of support vector machines in financial time series forecastingOmega, 2001
- Variant-based cost estimation based on Information ManagementInternational Journal of Production Research, 2000
- Neural networks for cost estimation: Simulations and pilot applicationInternational Journal of Production Research, 2000
- Fuzzy and neural approaches in engineeringNeural Networks, 1997