Breaching of Bridge Abutments and Scour at Exposed Abutment Columns
Authors:
- 1 October 2016
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Hydraulic Engineering
- Vol. 142 (10)
Abstract
Our note presents laboratory findings on the breaching of the earthfill embankments of bridge abutments at river crossings and the consequent scour at exposed abutment columns, the structural element supporting the end span of a bridge. Current United States design guidelines, based on Load and Resistance Factor Design, expressly recommend that abutment columns withstand scour if exposed during embankment breaching. The findings describe how breaching occurs for two abutment forms (spill-through and wingwall), and how pier-like scour may occur at their exposed columns. The findings include data regarding the time to breach, scour depths at breached abutments, and have significance for designing scour countermeasures.Keywords
This publication has 3 references indexed in Scilit:
- Failure of Spill-Through Bridge Abutments during Scour: Flume and Field ObservationsJournal of Hydraulic Engineering, 2015
- Experimental Investigation of the Effects of Soil Properties on Levee Breach by OvertoppingJournal of Hydraulic Engineering, 2015
- Scour at Bridge CrossingsJournal of the Hydraulics Division, 1960