Optimal Scheduling of Material Handling Devices in a PCB Production Line: Problem Formulation and a Polynomial Algorithm
Open Access
- 1 January 2008
- journal article
- research article
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2008 (1)
Abstract
Modern automated production lines usually use one or multiple computer‐controlled robots or hoists for material handling between workstations. A typical application of such lines is an automated electroplating line for processing printed circuit boards (PCBs). In these systems, cyclic production policy is widely used due to large lot size and simplicity of implementation. This paper addresses cyclic scheduling of a multihoist electroplating line with constant processing times. The objective is to minimize the cycle time, or equivalently to maximize the production throughput, for a given number of hoists. We propose a mathematical model and a polynomial algorithm for this scheduling problem. Computational results on randomly generated instances are reported.Keywords
Funding Information
- National Natural Science Foundation of China (50605052, NCET-06-0875)
- Program for New Century Excellent Talents in Universities (50605052, NCET-06-0875)
This publication has 17 references indexed in Scilit:
- Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approachInternational Journal of Production Research, 2004
- Optimal cyclic scheduling for printed circuit board production lines with multiple hoists and general processing sequenceIEEE Transactions on Robotics and Automation, 2003
- Cyclic scheduling in a robotic production lineJournal of Scheduling, 2002
- Scheduling no-wait robotic cells with two and three machinesEuropean Journal of Operational Research, 2000
- Cyclic scheduling of a hoist with time window constraintsIEEE Transactions on Robotics and Automation, 1998
- An improved algorithm for cyclic flowshop scheduling in a robotic cellEuropean Journal of Operational Research, 1997
- A greedy algorithm to determine the number of transporters in a cyclic electroplating processIIE Transactions, 1996
- DETERMINING OPTIMAL CYCLIC HOIST SCHEDULES IN A SINGLE-HOIST ELECTROPLATING LINEIIE Transactions, 1994
- An algorithm for scheduling a chemical processing tank lineProduction Planning & Control, 1993
- Mathematical Programming Solution of a Hoist Scheduling ProgramA I I E Transactions, 1976