An integrated system for tunnel construction safety control based on BIM–IoT–PSO
Authors:
- 31 October 2023
- journal article
- research article
- Published by Springer Nature in Journal of Civil Structural Health Monitoring
- Vol. 14 (2) , 269-284
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (52078093)
- Project 211 (XLYC1905015)
This publication has 34 references indexed in Scilit:
- Longitudinal deformation profile of a tunnel in weak rock mass by using the back analysis methodTunnelling and Underground Space Technology, 2018
- Stability analysis of rock blocks around a cross-harbor tunnel using the improved morphological visualization methodEngineering Geology, 2015
- Development of a web-based information system for shield tunnel construction projectsTunnelling and Underground Space Technology, 2013
- Back analysis of geomechanical parameters in underground works using an Evolution Strategy algorithmTunnelling and Underground Space Technology, 2013
- Back analysis of geomechanical parameters by optimisation of a 3D model of an underground structureTunnelling and Underground Space Technology, 2011
- Feedback analysis of tunnel construction using a hybrid arithmetic based on Support Vector Machine and Particle Swarm OptimisationAutomation in Construction, 2011
- Measurement and analysis of long-term behavior of Seoul metro tunnels using the Automatic Tunnel Monitoring SystemsTunnelling and Underground Space Technology, 2006
- Estimating mechanical rock mass parameters relating to the Three Gorges Project permanent shiplock using an intelligent displacement back analysis methodInternational Journal of Rock Mechanics and Mining Sciences, 2000
- Application of the Observational Procedure to Tunnel ConstructionSoils and Foundations, 1984
- Back analysis of measured displacements of tunnelsRock Mechanics and Rock Engineering, 1983