Layered Drum-Buffer-Rope-Based Scheduling of Reentrant Manufacturing Systems
Authors:
- 25 February 2013
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Semiconductor Manufacturing
- Vol. 26 (2) , 178-187
Abstract
Reentrant flow is a phenomenon in which a product revisits several machines multiple times on its production route. A manufacturing system with reentrant flow is well recognized as a highly complex system. Its reentrance feature challenges the scheduling researchers. To cope with this problem, a kind of drum-buffer-rope (DBR) technique proves to be a viable robust method for complex manufacturing system scheduling. This paper investigates DBR-based scheduling for reentrant manufacturing with a novel strategy. First, the multiple reentrant production flow is transferred into nonreentrant layer production lines. Then, the DBR-based scheduling algorithm is studied, and a layered scheduling algorithm (LSA) and the extended LSA are proposed. The proposed layered DBR-based scheduling strategy and the algorithms are demonstrated via a case study. They significantly outperform some commonly used policies in terms of such performance measures as mean cycle time, work-in-process, and equipment utilization ratios.Keywords
This publication has 24 references indexed in Scilit:
- Integrated intelligent optimized dynamic scheduling of semiconductor fabrication facilities2010
- Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing Systems: Software Tool and Simulation Case StudiesIEEE Transactions on Semiconductor Manufacturing, 2010
- An Intelligent Run-to-Run Control Strategy for Chemical–Mechanical Polishing ProcessesIEEE Transactions on Semiconductor Manufacturing, 2010
- Real-time buffer management method for DBR schedulingInternational Journal of Manufacturing Technology and Management, 2009
- A Lot Dispatching Strategy Integrating WIP Management and Wafer Start ControlIEEE Transactions on Automation Science and Engineering, 2007
- Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variationInternational Journal of Production Research, 2006
- A new scheduling approach using combined dispatching criteria in wafer fabsIEEE Transactions on Semiconductor Manufacturing, 2003
- Using the theory of constraints' production application in a semiconductor fab with a reentrant bottleneck2002
- An evaluation of the DBR control mechanism in a job shop environmentOmega, 2001
- Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing systemInternational Journal of Production Economics, 1997