Can Four-Phase Transmission Lines be Considered as a Practical Alternative to Traditional Three-Phase Lines in the European electricity market?
Authors:
- G. MazzantiG. Mazzanti
- S. QuaiaSQS. Quaia
- 1 July 2007
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1498-1503
Abstract
This paper aims at investigating the feasibility of four-phase (4P) overhead transmission lines, that could be viewed as a possible alternative to the traditional three-phase (3P) solutions for the construction of new transmission lines. This subject is important especially in the European framework, where expansion and reinforcement of existing transmission systems are increasingly required. This paper performs an economical comparison between innovative 4P transmission lines and traditional 3P lines, with the specific goal of evaluating the contests where a 4P transmission might compete with traditional 3P systems with single or double circuit lines.Keywords
This publication has 4 references indexed in Scilit:
- Three-phase-to-four-phase transformer for four-phase power-transmission systemsIEEE Transactions on Power Delivery, 2002
- Study of four-phase power transmission systemsIEE Proceedings - Generation, Transmission and Distribution, 2002
- High phase order economics: constructing a new transmission lineIEEE Transactions on Power Delivery, 1998
- IEEE Reliability Test SystemIEEE Transactions on Power Apparatus and Systems, 1979