A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times
- 19 January 2010
- journal article
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 22 (6) , 965-978
Abstract
No abstract availableKeywords
This publication has 51 references indexed in Scilit:
- Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraintsComputers & Industrial Engineering, 2004
- A novel metaheuristic approach for the flow shop scheduling problemEngineering Applications of Artificial Intelligence, 2004
- Scheduling flexible flow shops with sequence-dependent setup effectsIEEE Transactions on Robotics and Automation, 2000
- Parallel simulated annealing for structural optimizationComputers & Structures, 1999
- Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup timesInternational Journal of Production Research, 1995
- A survey of simulated annealing applications to operations research problemsOmega, 1994
- A theoretical framework for simulated annealingAlgorithmica, 1991
- On the Srikar-Ghosh MILP model for the iVx M SDST flowshop problemInternational Journal of Production Research, 1990
- A MILP model for the n -job, M -stage flowshop with sequence dependent set-up timesInternational Journal of Production Research, 1986
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954