Priority dispatching rules in an assembly shop
Author:
- D SculliDSD Sculli
Abstract
No abstract availableKeywords
This publication has 8 references indexed in Scilit:
- Optimal Due-Date Determination and Sequencing of n Jobs on a Single MachineJournal of the Operational Research Society, 1984
- Note—On Anomalies in Dynamic Ratio Type Scheduling Rules: A Clarifying AnalysisManagement Science, 1982
- Priority dispatching rules in job shops with assembly operations and random delaysOmega, 1980
- A Survey of Scheduling RulesOperations Research, 1977
- Multiple‐factor rules for sequencing with assembly constraintsNaval Research Logistics Quarterly, 1968
- JOB SHOPS SCHEDULING WITH DUE DATESInternational Journal of Production Research, 1967
- Simulation of a Simplified Job ShopManagement Science, 1960
- Simulation research on job shop productionNaval Research Logistics Quarterly, 1957