Flow shop scheduling with two distinct job due dates
- 26 November 2021
- journal article
- research article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 163, 107835
Abstract
No abstract availableKeywords
This publication has 21 references indexed in Scilit:
- Multicriteria schedulingEuropean Journal of Operational Research, 2005
- On the single machine total tardiness problemEuropean Journal of Operational Research, 2005
- Lot sizing in a no-wait flow shopOperations Research Letters, 1995
- The single-machine scheduling problem to minimize total tardiness subject to minimum number of tardy jobsIIE Transactions, 1995
- Flow-shops with a dominant machineEuropean Journal of Operational Research, 1992
- Scheduling n jobs on one machine to minimize the maximum tardiness with minimum numberComputers & Operations Research, 1983
- On J -maximal and J -minimal Flow-Shop SchedulesJournal of the ACM, 1981
- Scheduling in a Semi-Ordered Flow-shop Without Intermediate QueuesA I I E Transactions, 1980
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979
- Complexity of Machine Scheduling Problems1977