Channel Morphology Prediction with and without a Temporary Channel Upstream of the Elephant Butte Reservoir
Author:
- 17 May 2012
- conference paper
- Published by American Society of Civil Engineers (ASCE)
- p. 1236-1245
Abstract
A two-dimensional mobile-bed numerical model, SRH-2D v3, is used to evaluate a 10-year channel morphology of an 18-mile river reach upstream of the Elephant Butte Reservoir on the Rio Grande. Two scenarios are considered. One assumes that no temporary channel was excavated following the lowering of the reservoir pool; another assumes that a temporary channel was excavated instantly before the modeling period begins. The model simulation is carried out using the actual flow hydrograph from October, 2000 to June, 2010. The study aims to (a) determine the most likely channel morphology in 2010 had the temporary channel not been excavated and (b) help understand the impact of the temporary channel on the river morphology within the study reach. It is found that (a) no competent channel, similar to the excavated temporary channel, would form, had the temporary channel not been excavated; (b) the new predicted channel morphology is mostly in the form of a multi-channel type in 2010; and (c) the study points to the need for continued maintenance of the temporary channel at selected locations.Keywords
This publication has 6 references indexed in Scilit:
- Sediment Modeling of the Middle Rio Grande with and without the Temporary Channel: San Antonio to Elephant Butte Reservoir2012
- Soft Bedrock Erosion Modeling with a Two-Dimensional Depth-Averaged ModelJournal of Hydraulic Engineering, 2011
- Predicting contraction scour with a two-dimensional depth-averaged modelJournal of Hydraulic Research, 2010
- Two-Dimensional Depth-Averaged Flow Modeling with an Unstructured Hybrid MeshJournal of Hydraulic Engineering, 2010
- Two-Dimensional Total Sediment Load Model EquationsJournal of Hydraulic Engineering, 2008
- Modeling of Erosion and Deposition at Meandering Channels2008