Determining the best sequence of load pickup during power system restoration
Authors:
- 1 January 2010
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-4
Abstract
The first control action in power system restoration concerns the generation restart. In the initial phase of restoration, operators are often concerned with load pickup problems. One of the important problems during load pickup is keeping frequency response in allowable range. The aim of this paper is to determine the best sequence of load pickup by hydro and steam units during power system restoration based on frequency response of prime movers. Hydro power plants and combustion turbine units have the capability of black start operation and can be used for early stages of power system restoration. This paper considers hydro power plants for evaluating the stability and frequency response during load pickup in the early stages of restoration. Load pickup scheme has been developed based on using a pair of interconnected units.Keywords
This publication has 9 references indexed in Scilit:
- Guidelines for power system restoration in the Brazilian system2003
- A framework for black start and power system restoration2002
- Frequency response of prime movers during restorationIEEE Transactions on Power Systems, 1999
- New blackstart standards needed for competitive marketsIEEE Power Engineering Review, 1999
- Remote cranking of steam electric stationsIEEE Transactions on Power Systems, 1996
- Black-start and restoration of a part of the Italian HV network: modelling and simulation of a field testIEEE Transactions on Power Systems, 1996
- Tie line utilization during power system restorationIEEE Transactions on Power Systems, 1995
- Generation capability dispatch for bulk power system restoration: a knowledge-based approachIEEE Transactions on Power Systems, 1993
- Power System Restoration - A Task Force ReportIEEE Transactions on Power Systems, 1987