Heuristics for theN-product,M-stage, economic lot sizing and scheduling problem with dynamic demand
Authors:
- 1 July 2005
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 43 (13) , 2809-2828
Abstract
This paper presents a new composite heuristics approach for solving the N-product, M-stage lot sizing and scheduling problem with dynamic demands and limited production capacity. The first phase of these composite heuristics aims at finding a feasible solution. This solution is such that for each period and for each product, the lot size equals the net demand of the considered period plus the demand of a number of upcoming periods. If capacity does not satisfy all demands of a given period, we try to find earlier periods where we can produce the missing units. The second phase is an improvement procedure which recursively attempts to move back each lot, provided that it is both more economical to do so and capacity feasible. We also provide two variants of this heuristic to handle the case where production capacity can be increased by using overtime. Overtime is a usual practice in real life which, in many cases, allows a reduction of the overall cost. The first variant constructs the initial solution without recourse to overtime and introduces overtime only during the solution improvement phase. The second one considers overtime during both the first and second phases. The performance of the proposed heuristics is numerically assessed and the most efficient ones are identified.Keywords
This publication has 26 references indexed in Scilit:
- Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage ProductionManagement Science, 1993
- Scheduling Economic Lot Size Production RunsManagement Science, 1990
- The G-group heuristic for single machine lot schedulingInternational Journal of Production Research, 1987
- The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling ProblemManagement Science, 1982
- The Dynamic Lot-Sizing Problem for Multiple Items Under Limited CapacityA I I E Transactions, 1981
- A heuristic solution procedure for the multi‐item, single‐level, limited capacity, lot‐sizing problemJournal of Operations Management, 1981
- The Economic Lot Scheduling Problem (ELSP): Review and ExtensionsManagement Science, 1978
- A Dynamic Lot Sizing Algorithm with Capacity ConstraintsA I I E Transactions, 1975
- Deterministic Production Planning with Concave Costs and Capacity ConstraintsManagement Science, 1971
- A Dynamic Programming Approach to a Lot Size Scheduling ProblemManagement Science, 1966