Delay recovery model for high-speed trains with compressed train dwell time and running time
Authors:
Open Access
- 24 November 2020
- journal article
- research article
- Published by Springer Nature in Railway Engineering Science
- Vol. 28 (4) , 424-434
Abstract
Modeling the application of train operation adjustment actions to recover from delays is of great importance to supporting the decision-making of dispatchers. In this study, the effects of two train operation adjustment actions on train delay recovery were explored using train operation records from scheduled and actual train timetables. First, the modeling data were sorted to extract the possible influencing factors under two typical train operation adjustment actions, namely the compression of the train dwell time at stations and the compression of the train running time in sections. Stepwise regression methods were then employed to determine the importance of the influencing factors corresponding to the train delay recovery time, namely the delay time, the scheduled supplement time, the running interval, the occurrence time, and the place where the delay occurred, under the two train operation adjustment actions. Finally, the gradient-boosted regression tree (GBRT) algorithm was applied to construct a delay recovery model to predict the delay recovery effects of the train operation adjustment actions. A comparison of the prediction results of the GBRT model with those of a random forest model confirmed the better performance of the GBRT prediction model.Keywords
Funding Information
- Science and Technology Department of Sichuan Province (2018JY0567)
- National Natural Science Foundation of China (71871188)
This publication has 25 references indexed in Scilit:
- Delay Management Including Capacities of StationsTransportation Science, 2015
- Recovery of disruptions in rapid transit networksTransportation Research Part E: Logistics and Transportation Review, 2013
- Design of an effective algorithm for fast response to the re-scheduling of railway traffic during disturbancesTransportation Research Part C: Emerging Technologies, 2012
- Automated analysis of train event recorder data to improve micro-simulation models2010
- Estimation of prediction error by using K-fold cross-validationStatistics and Computing, 2009
- The Concept of Recoverable Robustness, Linear Programming Recovery, and Railway Applications2009
- A working guide to boosted regression treesJournal of Animal Ecology, 2008
- Railway Capacity and Train Delay Relationships2007
- Optimizing capacity utilization of stations by estimating knock-on train delaysTransportation Research Part B: Methodological, 2007
- Hybrid simulation for resolving resource conflicts in train traffic reschedulingComputers in Industry, 1998