Solution and Decision of Multi-Objective Integrated Process Planning and Scheduling Problem
Open Access
- 30 November 2023
- book chapter
- Published by IOS Press
- p. 783-790
Abstract
Effective integration of process planning and shop scheduling is the main way to solve the problems of low equipment utilization and poor production efficiency when process planning and shop scheduling are optimized separately. In order to achieve green and low-carbon manufacturing, this paper firstly takes the minimization of total carbon emissions, the maximum time of completion and delay time in the manufacturing process as the optimization goals. On account of the principle of nonlinear process planning, a multi-objective integrated process planning is established. Then, the NSGA-ჟ genetic algorithm is used to solve the problem, and the Pareto optimal solution set is obtained by optimization; and the TOPSIS decision method based on the entropy weight method is proposed to select the optimal process route and scheduling scheme from the Pareto optimal solution set. Finally, combined with cases, the validity of the model and the solution process is verified and also provides a basis for the decision of scheduling scheme in the actual production process.Keywords
This publication has 4 references indexed in Scilit:
- Clustering and Differential Evolution Algorithm for Solving Multi-objectives IPPS ProblemDEStech Transactions on Computer Science and Engineering, 2018
- A method integrating Taguchi, RSM and MOPSO to CNC machining parameters optimization for energy savingJournal of Cleaner Production, 2016
- A Fast Elitist Non-dominated Sorting Genetic Algorithm for Multi-objective Optimization: NSGA-II2000
- Decision making on the factory floor: An integrated approach to process planning and schedulingRobotics and Computer-Integrated Manufacturing, 1984