Abstract
Ports are emerging as convergence points for offshore renewable electricity, industrial CO₂ streams, and marine-fuel logistics. Yet early-stage assessment of integrated renewable-fuel projects remains fragmented across resource availability, process design, carbon integrity, terminal readiness, and ship-shore interfaces, creating a gap between technical feasibility and project readiness.This study develops a seven-gate pre-FEED techno-assurance framework for port-integrated offshore wind-to-methanol systems. The framework combines mass and energy balances, techno-economic assessment, screening life-cycle assessment, and Monte Carlo uncertainty analysis within a pass/hold/recycle decision process. It is demonstrated using a 50 MW offshore-wind reference case and a Safiport Derince-Safi Çimento logistics illustration.The reference system produces about 15.7 kt y⁻¹ of methanol. The estimated levelised production cost is EUR 1,614 t⁻¹ at EUR 50 MWh⁻¹ renewable electricity, while cradle-to-bunker emissions range from 207 to 438 kg CO₂-eq t⁻¹ depending on the capture-heat source. Capacity factor is the main production driver variability, whereas electricity price dominates cost uncertainty. Process design passes the screening gate, but resource, constructability, carbon-integrity, terminal-readiness, and marine-interface gates remain on hold pending site-specific evidence.The study does not propose a new methanol pathway. Instead, it introduces an evidence-maturity framework that helps distinguish process feasibility from project readiness before investment decisions.

This publication has 20 references indexed in Scilit: