A two-stage hybrid flowshop scheduling problem in machine breakdown condition
- 7 July 2011
- journal article
- research article
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 24 (1) , 193-199
Abstract
No abstract availableKeywords
This publication has 37 references indexed in Scilit:
- An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectivesEuropean Journal of Operational Research, 2008
- A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machinesComputers & Operations Research, 2008
- Stochastic single machine scheduling subject to machines breakdowns with quadratic early-tardy penalties for the preemptive-repeat modelJournal of Applied Mathematics and Computing, 2007
- A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion timeComputers & Operations Research, 2006
- A hybrid two-stage flowshop with limited waiting time constraintsComputers & Industrial Engineering, 2003
- Hybrid flow shop scheduling: A surveyComputers & Industrial Engineering, 1999
- Schedules for a two-stage hybrid flowshop with parallel machines at the second stageInternational Journal of Production Research, 1991
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954