Learning the Right Lessons—The Key to Delivering a Record ERD Well in the Caspian

Authors:

Abstract
The Operator has been developing oil reserves from an Early Oil Production (EOP) facility in the Caspian Sea since 1997. Because of the location of the platform, accessing the Northern reserves required the implementation of an ERD drilling program. Four ERD wells have been drilled since 2001. The last well was delivered on time and on budget to a measured depth of 7472m, and a step out of 6,315m making it the longest well drilled in the Caspian basin to date. This paper summarizes progress that has been made towards delivering successful ERD wells in the difficult Caspian basin. It describes how the basis of design for ERD wells 1 and 2 drew on the lessons from other projects including Wytch Farm, and why that philosophy did not produce the planned results. The paper will highlight the lessons learned applied to the third well, which was delivered with the majority of the well design objectives satisfied but over budget and with a significant amount of Non Productive Time (NPT). The paper will focus on the planning and execution of the fourth well, detailing how the right lessons, key technologies, key drilling practices, and right resources were applied to deliver the longest ERD well in the Caspian on time and within budget with a total NPT of less than 16%. The key components of success will be explored in detail. These include implementation of new technologies, including "stress cage", closed end conductor driving, cuttings flow metering, formation pressure LWD tools and"Geosteering" to manage geological uncertainty and allow excellent execution of the plan. The paper will discuss how a systematic, rigorous planning approach was applied. The modeling and simulation techniques critical to success used by the onshore planning team and also employed offshore using real time data for critical decision making will also be described Finally the process whereby this plan was handed over to the execution team offshore will be explained illustrating the importance of engaging the offshore team in the planning of this type of well. This was linked to the whole team's involvement in the development of the practices and procedures and use of the Technical Limit process on simpler wells before utilising them where there was no room for error. In conclusion, the paper will show how an integrated, multidisciplinary team can overcome significant technical challenges with the right processes, people, technology and support to deliver a successful well.