A simplified approach to the multi-item economic production quantity model with scrap, rework, and multi-delivery
Authors:
- Y.-S.P. ChiuYCY.-S.P. Chiu
- M.-F. WuMWM.-F. Wu
- S.W. ChiuSCS.W. Chiu
- H.-H. ChangHCH.-H. Chang
Open Access
- 1 August 2015
- journal article
- Published by Universidad Nacional Autonoma de Mexico in Journal of Applied Research and Technology
- Vol. 13 (4) , 472-476
Abstract
In a recent paper, Chiu et al. (2014) utilized mathematical modeling and differential calculus to determine the common production cycle time that minimizes total production, inventory, and delivery costs for a multi-item economic production quantity (EPQ) model with scrap, rework, and multi-delivery. The present study proposes an algebraic approach substituting the use of differential calculus on the system cost function for deriving the optimal common cycle time in the aforementioned multi-item EPQ model. This simplified approach may enable managing practitioners to resolve real multi-item EPQ models more effectivelyKeywords
This publication has 19 references indexed in Scilit:
- Multi-Item EPQ Model with Scrap, Rework and Multi-Delivery using Common Cycle PolicyJournal of Applied Research and Technology, 2014
- Finite Production Rate Model With Quality Assurance, Multi-customer and Discontinuous DeliveriesJournal of Applied Research and Technology, 2014
- Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rateEconomic Modelling, 2013
- Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in reworkEconomic Modelling, 2013
- Loose Coupling Based Reference Scheme for Shop Floor-Control System/Production-Equipment IntegrationJournal of Applied Research and Technology, 2013
- Dynamic Self-Assessment of Supply Chains Performance: an Emerging Market ApproachJournal of Applied Research and Technology, 2013
- Reexamination of “Combining an alternative multi-delivery policy into economic production lot size problem with partial rework” Using an Alternative ApproachJournal of Applied Research and Technology, 2013
- Intra-supply chain system with multiple sales locations and quality assuranceExpert Systems with Applications, 2013
- Optimal Aggregation of Multi-Item Production Smoothing ModelsManagement Science, 1978
- Multi-Item Production Planning—An Extension of the HMMS RulesManagement Science, 1970