Production scheduling of assembly fixtures in the aeronautical industry
- 1 January 2014
- journal article
- research article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 67, 195-203
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- Cutting optimization of structural tubes to build agricultural light aircraftsAnnals of Operations Research, 2008
- Link scheduling in wireless sensor networks: Distributed edge-coloring revisitedJournal of Parallel and Distributed Computing, 2008
- Time-constrained project schedulingJournal of Scheduling, 2008
- On the Complexity of Adjacent Resource SchedulingJournal of Scheduling, 2006
- Aircraft Loading and Structural Layout2004
- Scheduling with Conflicts on Bipartite and Interval GraphsJournal of Scheduling, 2003
- Offline programming and simulation help Boeing use giant automated riveter on C‐17 aircraftIndustrial Robot: the international journal of robotics research and application, 2001
- Mixed model assembly alternatives for low-volume manufacturing: The case of the aerospace industryInternational Journal of Production Economics, 2001
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problemEuropean Journal of Operational Research, 2000
- Resource-constrained project scheduling: Notation, classification, models, and methodsEuropean Journal of Operational Research, 1999