Coordinated scheduling of generators and tie lines in multi-area power systems under wind energy uncertainty
Authors:
- Heng ZhangHZHeng Zhang
- Xiao HuXHXiao Hu
- Haozhong ChengHCHaozhong Cheng
- Shenxi ZhangSZShenxi Zhang
- Shaoyun HongSHShaoyun Hong
- Qingfa GuQGQingfa Gu
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China
This publication has 34 references indexed in Scilit:
- Clustering based unit commitment with wind power uncertaintyEnergy Conversion and Management, 2016
- Multi-area economic dispatch with reserve sharing using dynamically controlled particle swarm optimizationInternational Journal of Electrical Power & Energy Systems, 2015
- Integration of Contingency Analysis With Systematic Transmission Capacity Expansion Planning: ERCOT Case StudyIEEE Transactions on Power Systems, 2015
- Decentralized Multi-Area Dynamic Economic Dispatch Using Modified Generalized Benders DecompositionIEEE Transactions on Power Systems, 2015
- A new scenario generation-based method to solve the unit commitment problem with high penetration of renewable energiesInternational Journal of Electrical Power & Energy Systems, 2015
- A Cooperative Multi-Area Optimization With Renewable Generation and Storage DevicesIEEE Transactions on Power Systems, 2014
- Exercise of Market Power on Ramp Rate in Wind-Integrated Power SystemsIEEE Transactions on Power Systems, 2014
- Modification of multi‐area economic dispatch with multiple fuel options, considering the fuelling limitationsIET Generation, Transmission & Distribution, 2014
- Optimal short-term load dispatch strategy in wind farmScience China Technological Sciences, 2012
- The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods SubcommitteeIEEE Transactions on Power Systems, 1999