Methods for identifying non-value-adding activities in construction processes
Authors:
Open Access
- 1 December 2021
- conference paper
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 1209 (1)
Abstract
Construction projects are characterized by low productivity due to many wasteful activities in construction processes. Wasteful or non-value-adding activities result in quality and profit loss in many construction projects. Consequently, construction needs more effective strategies for process innovation at all stages of the construction project life cycle. Analysis of the current state has shown the possibilities of improving construction processes through the implementation of technologies, methods and procedures of lean construction. Such improvements can help increase the efficiency and productivity of construction projects. Therefore, it is necessary to promote more effective construction waste management by identifying the causes of non-value-adding activities during the construction phase, and apply the gained data to eliminate wastes during the planning phase. The paper presents the most appropriate technologies and methods for collecting data on non-value-adding activities.Keywords
This publication has 17 references indexed in Scilit:
- Wearable technology for personalized construction safety monitoring and trending: Review of applicable devicesAutomation in Construction, 2018
- Lean production design using value stream mapping and ergonomics approach for waste elimination on buffing panel upright processIOP Conference Series: Materials Science and Engineering, 2017
- Activity analysis of construction equipment using audio signals and support vector machinesAutomation in Construction, 2017
- Fusion of Photogrammetry and Video Analysis for Productivity Assessment of Earthwork ProcessesComputer-Aided Civil and Infrastructure Engineering, 2017
- Gathering big data for teamwork evaluation with microworldsCluster Computing, 2016
- Design: Selection of Data Collection MethodsJournal of Graduate Medical Education, 2016
- Value stream mapping to reduce the lead-time of a product development processInternational Journal of Production Economics, 2015
- A wireless body area network of intelligent motion sensors for computer assisted physical rehabilitationJournal of NeuroEngineering and Rehabilitation, 2005
- Quantifying Levels of Wasted Time in Construction with Meta-AnalysisJournal of Construction Engineering and Management, 2005
- A survey of the site records kept by construction supervisorsConstruction Management and Economics, 1999