Neptune Project: Regulatory and Classification Issues and Requirements

Authors:

Abstract
This paper summarizes the responsibilities of the American Bureau of Shipping Classification Society (ABS), Minerals Management Service (MMS), and the United States Coast Guard (USCG) for permitting a Floating Production System (FPS). Authors present an overview of the permitting strategy and the regulatory framework in regard to the Neptune Sparbased FPS. A list of regulatory approvals is identified for proper planning of the project activities to prevent project delays. A table is provided to show the responsibility delineation, and the administration of paper flow for the approval process. This paper highlights the operator's strategy of approaching the classification society andregulatory agencies to bring them on-board in the early stage of the project. Introduction: During the last two decades, the offshore industry has been successfully meeting the challenge of producing hydrocarbons in deep water by innovative design of platforms includingcompliant towers, tension leg platforms (TLP), and floating production semi-submersibles. One such innovative concept is the Spar based FPS which has been studied in great detail during the last 4-6 years. Oryx Energy Company (Oryx) and CNG Producing Company concluded in 1994 that the Spar based FPS waseconomical in comparison to a TLP and other competing concepts for the Viosca Knoll Block 826 field. The Neptune Spar has been successfully installed in Viosca Knoll (VK)Block 826 in the Gulf of Mexico (GOM), located approximately 90 miles south of Mobile, Alabama in 1.930 feet of water. It is located in the MMS New Orleans District of the Gulf of Mexico Region and in the USCG New OrleansMarine Inspection and Captain of the Port Zone of the Eighth Coast Guard District. For this new concept, the requirements and responsibilities of the primary regulatory agencies, MMS and USCG, were not well understood, nor well defined in the regulations. The Spar structure falls under the "Platform Verification Program" administered by the MMS: therefore, aCertification Verification Agent (CVA) needed to be identified to review the design, fabrication and installation ofthe Spar. The permitting process to obtain the necessary approvals by the USCG were not familiar to Oryx. In discussions with the USCG, several different permitting options were discussed for the project, each with their benefits and drawbacks. These included applying for a Certificate of Inspection (COI) from the USCG with the USCG reviewing the design and conducting inspections; applying forclassification from ABS and a COI from the USCG with ABS reviewing the design and conducting inspections for the USCG, or documenting the Spar in a foreign country and applying for a Letter of Compliance (LOC) from the USCG. Oryx sought a streamlined permitting and inspection strategy and after reviewing the options, chose to apply for class from ABS, with ABS responsible for the design review and inspections for the USCG and to nominate ABS as the CVA for design, fabrication and installation.