Optimizing Transport Scheme of High Value-Added Shipments in Regions without Express Train Services
Open Access
- 2 November 2019
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 11 (21) , 6108
Abstract
In railway transportation, high value-added shipments in regions with large traffic volumes are generally delivered by express train services, since these freights need to be delivered in a short time. However, there are also high value-added shipments in areas where express train services are not available. If these freights are delivered by the traditional approaches (i.e., the freight cars are delivered to the adjacent classification yard by local trains, combined with other freight cars to form a train, and finally sent to the destination according to the transportation plan) with multiple reclassifications (a reclassification is when wagons are separated from their original train and then join another train in a classification yard), it will lead to delivery delays and economic losses to shippers and contribute to severe carbon emissions. In this context, this paper proposes an innovative method to deliver high value-added shipments in regions without express train services, which is called the method of reserving axle loads. The differences in assembling and transfer costs achieved by the method of reserving axle loads and traditional method are analyzed, especially the car-hours saved for the accumulation process of freight cars in a classification yard. Then, a corresponding mathematical model is established, which involves four scenarios: reserving axle loads for departing; reserving axle loads for arriving; reserving axle loads for both departing and arriving; and not reserving axle loads. Finally, the practicability and feasibility of the model was verified by two numerical experiments.Keywords
Funding Information
- Ministry of Science and Technology of the People's Republic of China (2018YFB1201402)
This publication has 26 references indexed in Scilit:
- Modeling formulation and a new heuristic for the railroad blocking problemApplied Mathematical Modelling, 2018
- Modeling the railway network design problem: A novel approach to considering carbon emissions reductionTransportation Research Part D: Transport and Environment, 2017
- Flow assignment model for quantitative analysis of diverting bulk freight from road to railwayPLOS ONE, 2017
- Optimizing the freight train connection service network of a large-scale rail systemTransportation Research Part B: Methodological, 2012
- Solving train formation problem using simulated annealing algorithm in a simplex frameworkJournal of Advanced Transportation, 2012
- Solving railroad blocking problem using ant colony optimization algorithmApplied Mathematical Modelling, 2011
- Solving Real-Life Railroad Blocking ProblemsInterfaces, 2007
- Railroad Blocking: A Network Design ApplicationOperations Research, 2000
- Constructing Railroad Blocking Plans to Minimize Handling CostsTransportation Science, 1998
- A model for the blocking of trainsTransportation Research Part B: Methodological, 1980