A Power Delivery Network and Cell Placement Aware IR-Drop Mitigation Technique: Harvesting Unused Timing Slacks to Schedule Useful Skews
Authors:
- Lakshmi BhamidipatiLBLakshmi Bhamidipati
- Bhoopal GunnaBGBhoopal Gunna
- Houman HomayounHHHouman Homayoun
- Avesta SasanASAvesta Sasan
- 1 July 2017
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 272-277
Abstract
This paper, presents a novel technique for reducing the intensity of IR hot-spots by leveraging the unused timing slacks to schedule useful skews. The peak current minimization problem is reformulated into a collection of smaller problems of reducing the peak current of each via-stack in the on-chip Power Delivery Network (PDN). In addition to timing information, it considers the PDN and cell placement information while scheduling the clock arrival times. Hence, while reducing the peak current, it effectively reduces the intensity the IR hot- spots. Application of the proposed solution to a selected number of IWLS benchmarks reduces the peak IR-drop by ±35%, and peak current by ±37%.Keywords
This publication has 9 references indexed in Scilit:
- An Efficient Method for Clock Skew Scheduling to Reduce Peak Current2016
- Clock Tree Resynthesis for Multi-Corner Multi-Mode Timing ClosureIEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems, 2015
- Near-threshold voltage (NTV) design2012
- Peak current reduction by simultaneous state replication and re-encoding2010
- Fast multi-domain clock skew scheduling for peak current reduction2006
- Minimizing peak current via opposite-phase clock tree2005
- Retiming and clock scheduling to minimize simultaneous switching2004
- Power supply noise suppression via clock skew scheduling2003
- Clock-skew optimization for peak current reduction2002