Calculation Method of Early-Age Crack Width in Reinforced Concrete Bridge through a Nonlinear FEA Model
Authors:
Open Access
- 30 April 2019
- journal article
- research article
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 23 (7) , 3088-3096
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Identification of Early-Age Cracking in Concrete Bridge DecksJournal of Performance of Constructed Facilities, 2016
- Analysis, prediction, and case studies of early-age cracking in bridge decksInternational Journal of Advanced Structural Engineering, 2016
- Crack width analysis of reinforced concrete members under flexure by finite element method and crack queuing algorithmEngineering Structures, 2015
- Early-age restrained shrinkage cracking of GFRP-RC bridge deck slabs: Effect of environmental conditionsCement and Concrete Composites, 2015
- Shrinkage and cracking of restrained ultra-high-performance fiber-reinforced concrete slabs at early ageConstruction and Building Materials, 2014
- Causes and controls of cracking at bridge deck overlay with very-early strength latex-modified concreteConstruction and Building Materials, 2014
- Limiting Early-Age Cracking in Concrete Bridge DecksAdvances in Civil Engineering Materials, 2013
- Investigation of Cracking in Concrete Bridge Decks at Early AgesJournal of Bridge Engineering, 1999
- Plastic-Damage Model for Cyclic Loading of Concrete StructuresJournal of Engineering Mechanics, 1998
- A plastic-damage model for concreteInternational Journal of Solids and Structures, 1989