A MIP approach for balancing transfer line with complex industrial constraints
Authors:
- Mohamed EssafiMEMohamed Essafi
- Xavier DelormeXDXavier Delorme
- Alexandre DolguiAlexandre Dolgui
- Olga GuschinskayaOGOlga Guschinskaya
- 1 April 2010
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 58 (3) , 393-400
Abstract
No abstract availableKeywords
This publication has 19 references indexed in Scilit:
- Balancing and scheduling tasks in assembly lines with sequence-dependent setup timesEuropean Journal of Operational Research, 2008
- A random search and backtracking procedure for transfer line balancingInternational Journal of Computer Integrated Manufacturing, 2008
- Assembly line balancing: Which model to use when?International Journal of Production Economics, 2008
- MIP approach to balancing transfer lines with blocks of parallel operationsIIE Transactions, 2006
- A weighted approach for assembly line design with station paralleling and equipment selectionIIE Transactions, 2003
- State of art of optimization methods for assembly line designAnnual Reviews in Control, 2002
- Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstationsInternational Journal of Production Research, 1998
- A parallel station heuristic for the mixed-model production line balancing problemInternational Journal of Production Research, 1997
- Assembly line balancing with parallel workstations and dead timeInternational Journal of Production Research, 1989
- A branch and bound algorithm for assembly line balancing with parallelingInternational Journal of Production Research, 1975