Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore
- 1 May 2017
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 33 (3)
Abstract
The construction of green buildings differs from that of traditional buildings in terms of the design, materials, and processes. The barriers to the development of green buildings, such as the high cost and project delay, further indicate that the productivity of green building construction needs to be tackled. This study aims to identify the critical factors affecting the productivity of green building construction projects by assessing the likelihood, impact, and criticality of the factors with comparisons against traditional projects. To achieve the objective, 26 factors were identified from a comprehensive literature review and interviews with industry experts. A questionnaire survey was then performed with 32 professionals experienced in green building projects, and three postsurvey interviews were also conducted. The results indicated that workers’ experience, technology, design changes, workers’ skill level, and planning and sequencing of work were the top five most critical factors affecting the productivity of green building construction projects. Furthermore, the differences in the criticality of the technical factors between green and traditional projects were remarkable, which should draw the practitioners’ attention. The findings from this study not only fill a gap in the project management body of knowledge for green buildings but also help practitioners identify specific adjustments to traditional project management processes and practices achieving a more productive delivery of green buildings.Keywords
This publication has 42 references indexed in Scilit:
- Green buildings cost premium: A review of empirical evidenceEnergy and Buildings, 2016
- Factors Influencing Construction Labor Productivity in EgyptJournal of Management in Engineering, 2014
- Using the Thermal Work Limit as an Environmental Determinant of Heat Stress for Construction WorkersJournal of Management in Engineering, 2013
- Analysing factors affecting delays in Indian construction projectsInternational Journal of Project Management, 2012
- The market for green building in developed Asian cities—the perspectives of building designersEnergy Policy, 2009
- Measuring productivity in the construction industryBuilding Research & Information, 2006
- Partial Factor Productivity and Equipment Technology Change at Activity Level in U.S. Construction IndustryJournal of Construction Engineering and Management, 2002
- How building design imperatives constrain construction productivity and qualityEngineering, Construction and Architectural Management, 2002
- Multiskilled Labor Utilization Strategies in ConstructionJournal of Construction Engineering and Management, 1998
- Flexibility, labour subcontracting and HRM in the construction industry in Singapore: can the system be refined?The International Journal of Human Resource Management, 1997