Performance test of High-durable Precast Concrete Pavement System
Authors:
- Okpin NaONOkpin Na
- Taesuk SeoTSTaesuk Seo
- Junhyung KimJKJunhyung Kim
- Yunsoo JungYJYunsoo Jung
- Jisun ChoiJCJisun Choi
- Hoonjae ChoiHCHoonjae Choi
- 30 June 2016
- journal article
- Published by Korean Society of Hazard Mitigation in Journal of the Korean Society of Hazard Mitigation
- Vol. 16 (3) , 221-228
Abstract
Performance test of High-durable Precast Concrete Pavement System Concrete pavement;Precast slab;Durability;Fatigue test;Dowel bar; The cast in-place concrete pavement takes easily negative effects on the reduction of construction time due to the quality of concrete, so that a precast concrete (PC) pavement system has been developed. The purpose of this study is to suggest the new slab connecting method for rapid PC pavement construction and flip-over for the improvement of durability. To evaluate the performance of this pavement system, rapid chloride penetration test, scaling test, and fatigue test for the serviceability against traffic loadings were conducted. As a result of RCPT and scaling test, the bottom side of PC slab was superior to the pouring side of it. When the cyclic loading of 80 kN was applied to slab connection, there was no crack to be observed and the load transfer of dowel bar was reduced up to 10%.Keywords
This publication has 2 references indexed in Scilit:
- Size Effect in Blunt Fracture: Concrete, Rock, MetalJournal of Engineering Mechanics, 1984
- Precast Repair of CRC PavementsJournal of Transportation Engineering, 1983