APPLYING METAHEURISTIC STRATEGIES IN CONSTRUCTION PROJECTS MANAGEMENT
Open Access
- 28 September 2012
- journal article
- research article
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 18 (5) , 621-630
Abstract
This work deals with the application of artificial intelligence instruments in a building schedule. In this article there was presented an original optimization scatter search algorithm taking into consideration both technological and organizational restrictions. This algorithm was applied to the real analysis of the industrial building project realization.Keywords
This publication has 36 references indexed in Scilit:
- Simulation and analytical techniques for construction resource planning and schedulingAutomation in Construction, 2012
- Methods of risk evaluation in manufacturing systemsArchives of Civil and Mechanical Engineering, 2009
- A branch and bound algorithm to minimize the total tardiness for m-machine permutation flowshop problemsEuropean Journal of Operational Research, 2006
- A very fast tabu search algorithm for the permutation flow shop problem with makespan criterionComputers & Operations Research, 2004
- Minimizing the weighted number of tardy jobs on a two-machine flow shopComputers & Operations Research, 2003
- Optimizing Resource Utilization for Repetitive Construction ProjectsJournal of Construction Engineering and Management, 2001
- Scheduling Projects with Repeating ActivitiesJournal of Construction Engineering and Management, 1998
- Scheduling/Cost Optimization and Neural Dynamics Model for ConstructionJournal of Construction Engineering and Management, 1997
- Integer programming formulations for the multi-depot vehicle routing problem: Comments on a paper by Kulkarni and BhaveEuropean Journal of Operational Research, 1989
- The Complexity of Flowshop and Jobshop SchedulingMathematics of Operations Research, 1976