Abstract
This work introduces a systematic design procedure for CO2 absorption-based processes using as solvent the mixture of AMP-PZ. We propose to minimize the total CO2 avoided cost. We make the assumption that the capture plant is retrofitted to an existing industrial plant whose operation and production are not changed. Under this assumption, we can define the total CO2 avoided cost by using a method which considers the discounted cash flow resulted from implementing the capture unit. We consider a standard absorber-desorber process configuration, and we model the process in AspenPlus®. We systematically identify the degrees of freedom available for design, and we divided these into degrees of freedom used internally in the simulation in a Design-Specification block (e.g., solvent flowrate and reboiler duty), and degrees of freedom available to an external derivative-free optimizer (e.g., absorber packing height, AMP and PZ composition, and lean solvent loading). As a case study we consider a Waste-to-Energy plant.