Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells
Authors:
- 15 January 2008
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 46 (2) , 371-404
Abstract
In this study, four different bi-objective mathematical models are presented to solve the cell loading problem with setup times in labour-intensive cellular environments. The objectives of each model are minimizing the number of the tardy jobs and the minimizing the total manpower needed. Model I does the following four tasks simultaneously: (1) determine the number of cells to open; (2) determine cell size among alternatives for each opened cell; (3) assign products to cells (cell loading); (4) determine the sequence of products in each cell. The other three models are extensions of model I. Model II restricts all cells to the common cell size. Model III allows lot-splitting and model IV allows lot-splitting only if the entire job can be completed. Fuzziness stems from the fuzzy aspiration levels attained to both objective functions. Fuzzy mathematical models are developed for each crisp model and fuzzy achievement function is defined by different fuzzy operators. Experimentation is conducted in two stages. In the first stage, an example problem is solved to represent the performance of the min-operator, fuzzy and- operator and the proposed representation for the fuzzy mathematical modelling. In the second stage, another example is considered to compare the models and to investigate the behaviour of each model with different setup time levels. First, models are solved to maximize the number of the early jobs considering each possible manpower level as a constraint and then fuzzy model solutions are obtained. Experimentation shows that each model represents alternative cell loading systems requirements effectively and the fuzzy and-operator and the proposed fuzzy model representations are convenient to reach the efficient solutions for each model with non-zero setup times.Keywords
This publication has 17 references indexed in Scilit:
- A bi-criterion single-machine scheduling problem with learning considerationsActa Informatica, 2004
- On the approximate tradeoff for bicriteria batching and parallel machine scheduling problemsTheoretical Computer Science, 2003
- On two single machine scheduling problems with fuzzy processing times and fuzzy due datesEuropean Journal of Operational Research, 2003
- Minimizing mean squared deviation of completion times with maximum tardiness constraintEuropean Journal of Operational Research, 2001
- Cell design and loading in the presence of alternative routingInternational Journal of Production Research, 1999
- What Are Genetic Algorithms?1999
- A hierarchical model for the cell loading problem of cellular manufacturing systemsInternational Journal of Production Research, 1998
- Fuzzy job shop schedulingInternational Journal of Production Economics, 1996
- Local search algorithms for flow shop scheduling with fuzzy due-datesInternational Journal of Production Economics, 1994
- Decision-Making in a Fuzzy EnvironmentManagement Science, 1970