Prestressing of bridges allows construction of long spanned bridges made from thin structural members with high flexural and shear capacity. Studies have shown that some of the existing prestressed bridges are not meeting their designed service life due to corrosion of the tendons. The main reasons are poor construction practices in combination with inadequate inspection and maintenance plans. This paper provides a summary of repair options for corrosion-damaged prestressed concrete structures with focus on the individual components of the prestressed system. The applicability of identified repair options to Norwegian conditions is discussed.Keywords
This publication has 26 references indexed in Scilit:
- Numerical investigation into the effects of corrosion on the shear performance of pretensioned bridge girders with cast-in-place slabsStructures, 2022
- Corrosion‐induced damages and failures of posttensioned bridges: A literature reviewStructural Concrete, 2022
- Durability of pretensioned concrete girders in coastal climate bridges: Basis for better maintenance and future designStructural Concrete, 2019
- Strengthening a 20-Year-Old Post-Tensioned Concrete Box Beam with Double-Layer Prestressed Steel Wire RopesJournal of Bridge Engineering, 2018
- A thermal analysis of flexible filler injection for unbonded post-tensioning tendonsConstruction and Building Materials, 2016
- Corrosion of prestress and post-tension reinforced-concrete bridges2016
- fib Model Code for Concrete Structures 20102013
- Post-Damage Repair of Prestressed Concrete GirdersInternational Journal of Concrete Structures and Materials, 2012
- High pH Corrosion of Prestressing Steel in Segregated Grout2011
- A residual strength model for deteriorating post-tensioned concrete bridgesComputers & Structures, 2001