A compact heuristic for common cycle lot-size scheduling in multi-stage, multi-product production processes
Author:
- M.K. El-NajdawiMEM.K. El-Najdawi
- 30 April 1992
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 27 (1) , 29-41
Abstract
No abstract availableThis publication has 11 references indexed in Scilit:
- Common cycle scheduling in a multistage production processEngineering Costs and Production Economics, 1990
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production SystemsManagement Science, 1989
- The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling ProblemManagement Science, 1982
- The Multi-Product Production Cycling ProblemA I I E Transactions, 1980
- The Economic Lot Scheduling Problem (ELSP): Review and ExtensionsManagement Science, 1978
- Lot Sizing and Sequencing for N Products on One FacilityManagement Science, 1977
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity ModelManagement Science, 1975
- An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling ProblemManagement Science, 1973
- Scheduling in a Multistage Production System with Set-up and Inventory CostsA I I E Transactions, 1972
- The Economic Lot Sizes in Multistage Production SystemsA I I E Transactions, 1970