Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application
Open Access
- 29 April 2023
- journal article
- research article
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 27 (6) , 2356-2371
Abstract
No abstract availableKeywords
This publication has 30 references indexed in Scilit:
- Hybrid particle swarm optimization for preemptive resource-constrained project schedulingNeurocomputing, 2015
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splittingComputers & Operations Research, 2015
- Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problemsAutomation in Construction, 2014
- Project Scheduling Problem with Stochastic Resource-Dependent Activity DurationApplied Mechanics and Materials, 2013
- Definitions, concepts and new directions in Industrialized Building Systems (IBS)KSCE Journal of Civil Engineering, 2013
- System reliability optimization model for construction projects via system reliability theoryAutomation in Construction, 2012
- Short term generation scheduling of cascaded hydro electric system using novel self adaptive inertia weight PSOInternational Journal of Electrical Power & Energy Systems, 2012
- A chaotic PSO approach to multi-mode resource-constraint project scheduling with uncertaintyInternational Journal of Computational Science and Engineering, 2011
- A heuristic for network project scheduling with random activity durations depending on the resource allocationInternational Journal of Production Economics, 1998
- PSPLIB - A project scheduling problem libraryEuropean Journal of Operational Research, 1997