Floating offshore wind turbines (FOWTs) are essential for exploiting wind energy in deep and remote seas, overcoming the water-depth limitations of fixed-bottom turbines. However, their operation and maintenance (O&M) complexity and cost increase accordingly, prompting a shift from traditional methods to on-site operations. The replacement of large components—such as blades, generators, and nacelles—is one of the most critical and high-risk operations. To address these challenges, this study investigates the dynamic coupling characteristics between a floating wind turbine and a semi-submersible crane vessel during offshore large-component replacement. Focusing on the blade lowering phase, the effects of sling stiffness and lowering speed on the dynamic response of the blade lowering process are examined. The simulations consider a single environment with a significant wave height of 1.5 m, a spectral peak period of 6 s, and a 10 m reference wind speed of 12 m/s. In the first 200 s of lowering, the Sling 3 case exhibits a peak blade roll of approximately 3.5° and a peak plotted sling tension of about 180 kN, compared with about 110 kN for Sling 1 and Sling 2. The results provide important engineering guidance for improving the stability and safety of on-site large-component replacement operations and reducing maintenance costs.
Funding Information
  • National Natural Science Foundation of China (52522112)
  • GJYC program of Guangzhou (2024A04J6297)
  • GJYC program of Guangzhou (2024D03J0022)
  • Guangdong Basic and Applied Basic Research Foundation (2024B1515250005)
  • Guangdong Innovation and Entrepreneurship Team Project (2023ZT10H152)
  • Fundamental Research Funds for the Central Universities (2026ZYGXZR025)

This publication has 17 references indexed in Scilit: