Abstract
Owning to the application of artificial intelligence and big data analysis in industry, automobiles, aerospace, and other fields, the high-bandwidth candidate, time-sensitive networking (TSN), is introduced into the data communication network. Apart from keeping the safety-critical and real-time requirements, it faces challenges to satisfy large traffic transmission, such as sampled video for computer vision. In this paper, we consider task scheduling and time-sensitive network together and formalize them into a first-order-constraints satisfy module theory (SMT) problem. Based on the result of the solver, we build flow-level scheduling based on IEEE 802.1 Qbv. By splitting the flow properly, it can reduce the constraint inequality as the traffic grows more than the traditional frame-based programming model and achieve near 100% utilization. It can be a general model for the deterministic task and network scheduling design.
Funding Information
  • Beijing Smart-Chip Microelectronics Technology Co., Ltd. (ZR2022LZH015, 92067206)
  • Natural Science Foundation of Shandong Province (ZR2022LZH015, 92067206)
  • National Natural Science Foundation of China (ZR2022LZH015, 92067206)