Contractor selection: fuzzy-control approach
- 1 May 2008
- journal article
- research article
- Published by Canadian Science Publishing in Canadian Journal of Civil Engineering
- Vol. 35 (5) , 473-486
Abstract
This paper presents a fuzzy-logic-based system for selecting contractors. This tool, which was based on the fuzzy control technique, was created for the private sector client in traditional design–bid–build projects with one-step selection processes, but its philosophy can also serve other types of clients, industries, contracts, and selection processes. The system develops an assessment of different qualitative and quantitative issues that influence a contractor’s suitability for constructing a specific design in a specific environment (client’s needs and objectives, objectives prioritization, etc.), taking into account the risk of not achieving the client’s objectives. A computer application was developed and validated, including a Delphi analysis with professionals who are experts in contractor selection. The application covers the possibility of using different selection policies, when the essential project objective is cost, time or quality. As part of the validation process, a neural network was developed to prove that the fuzzy-control tool has a behavior that can be recognized by a neural network.Keywords
This publication has 31 references indexed in Scilit:
- A reasoning process in support of integrated project controlCanadian Journal of Civil Engineering, 2005
- Fuzzy Pattern Recognition Approach to Construction Contractor SelectionFuzzy Optimization and Decision Making, 2005
- Construction prequalification using data envelopment analysisCanadian Journal of Civil Engineering, 2005
- Conceptual cost estimation of building projects with regression analysis and neural networksCanadian Journal of Civil Engineering, 2004
- A Multi‐Criteria Group Decisionmaking Model for Supplier RatingJournal of Supply Chain Management, 2002
- Contractor selection criteria: a cost-benefit analysisIEEE Transactions on Engineering Management, 2001
- A needs-based methodology for classifying construction clients and selecting contractorsConstruction Management and Economics, 1998
- Criteria for contractor selectionConstruction Management and Economics, 1997
- Contractor selection: qualification and bid evaluationCanadian Journal of Civil Engineering, 1996
- Knoledge-Based Systems and Fuzzy Sets in Risk ManagementComputer-Aided Civil and Infrastructure Engineering, 1987