A continuous time model for multiple yard crane scheduling with last minute job arrivals
Authors:
- Wenkai LiWLWenkai Li
- Mark GohMark Goh
- Yong WuYWYong Wu
- M.E.H. PeteringMPM.E.H. Petering
- R. de SouzaRSR. de Souza
- Y.C. WuYWY.C. Wu
- 1 April 2012
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 136 (2) , 332-343
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- The integrated yard truck and yard crane scheduling problem: Benders’ decomposition-based methodsTransportation Research Part E: Logistics and Transportation Review, 2010
- Crane scheduling in a shipbuilding environmentInternational Journal of Production Economics, 2010
- Deployment strategies of double-rail-mounted gantry crane systems for loading outbound containers in container terminalsInternational Journal of Production Economics, 2008
- Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithmInternational Journal of Production Economics, 2007
- A stochastic beam search for the berth allocation problemDecision Support Systems, 2007
- Crane scheduling with non-crossing constraintJournal of the Operational Research Society, 2006
- A m‐parallel crane scheduling problem with a non‐crossing constraintNaval Research Logistics (NRL), 2006
- Yard crane scheduling in port container terminalsApplied Mathematical Modelling, 2005
- Crane scheduling with spatial constraintsNaval Research Logistics (NRL), 2004
- A routing algorithm for a single straddle carrier to load export containers onto a containershipInternational Journal of Production Economics, 1999