A Petri net based approach for analysing tool management issues in FMS
Authors:
- 1 June 1992
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 30 (6) , 1427-1446
Abstract
Tool management issues are gaining importance as they represent complex obstacles to the implementation of flexible manufacturing systems (FMSs). Both researchers and FMS users are interested in tool management; the most dynamic facility involving large numbers and varieties. To comprehend many complex asynchronous concurrent transactions in its management systems, the need for rigid mathematical algorithms is often stressed. In this paper, Petri nets (PTNs) are applied to analyse the issues at machine group level to get a better insight into tool management. Importance and relevance of PTNs for investigating tasks involved in the functioning and designing of tool management systems is made clear at various hierarchical levels (tool, machine, group and system levels). To establish the potential use of PTNs they are applied to the modelling of tasks involved in a centralized tool management system. Quantitative analysis is carried out by associating times with some or all transitions in the Petri net model. The system considered for analysis comprises a tool crib, three AGVs, two robots, one presetting station and two machining centres. Performance criteria used are (i) the production rate and (ii) the dynamic behaviour of the FMS. Analysis considers one of the possible product varieties for two different production volumes at two different machining centres, but it can be extended to different products. Performance of the system with tool sharing among the machining centres is found to have advantages over that where tool sharing is absentKeywords
This publication has 23 references indexed in Scilit:
- Simulating flexible automated forming and assembly systemsJournal of Materials Processing Technology, 1990
- F.M.S. tool supply in a stochastic environment: Strategies and related reliabilitiesInternational Journal of Machine Tools and Manufacture, 1990
- Cutter manufacturer finds the right toolIntegrated Manufacturing Systems, 1990
- Real-time tool control and job dispatching in flexible manufacturing systemsInternational Journal of Production Research, 1989
- Loading tools to machines in flexible manufacturing systemsComputers & Industrial Engineering, 1988
- The machine loading and tool allocation problem in a flexible manufacturing systemInternational Journal of Production Research, 1987
- Work scheduling in FMS under tool availability constraints†International Journal of Production Research, 1986
- Closed analytical formulae for evaluating flexible manufacturing system performance measuresInternational Journal of Production Research, 1986
- Experimental investigation of real-time scheduling in flexible manufacturing systemsAnnals of Operations Research, 1985
- On the structure and logic of typical material flow systems†International Journal of Production Research, 1982